The lift-off was originally planned at 9.58 pm on Monday but ISRO authorities later rescheduled to 10 pm. However, there was no official information behind the reason for the rescheduling.
By mastering the space docking technologies, ISRO is set to enhance its operational flexibility besides expanding its mission horizons.
Discover the stories of your interest
Apart from the SpaDeX mission, ISRO scientists have configured the fourth stage of the rocket (PS-4) as the PSLV Orbital Experimental Module-4 (POEM-4) in which 24 small payloads which comprise of 14 from ISRO and 10 from academia, would be placed in over 90 minutes after the lift-off in different orbits.